d
e
f
g
h
©
Street
Crane
Co
Ltd
Page
22
of
103
Ref:
D3256
rev.
B
Figure
11
–
Low
Headroom
Runway
Clearance
Lower
the
hoist
unit
so
that
the
wheels
are
touching
the
beam
flange
ensuring
that
the
3
‐
5mm
clearance
gap
is
maintained.
1
Do
not
remove
the
hoist
lifting
tackle
until
the
hoist
is
fully
secured
on
the
runway.
Remove
each
of
the
four
M12
locking
grub
screws
from
the
panel
side
trolley
castings.
Using
the
single
cone
point
setscrew,
screw
into
each
hole
in
turn
and
tighten
until
a
‘centre
‐
pop’
indent
is
made
in
the
hoist
legs.
Using
a
10mm
diameter
drill,
drill
a
full
cone
of
10mm
diameter
into
both
legs
at
four
positions
(see
Figure
12).
Remove
any
swarf
from
the
holes
using
a
magnet.
Replace
cone
point
setscrew
in
its
storage
position,
securing
with
the
locknut.
Figure
12
–
Setting
the
Low
Headroom
Legs
Replace
each
of
the
four
M12
locking
grub
screws
and
tighten
to
40Nm.
Secure
each
grub
screw
with
locknut
tightened
to
40Nm.
Replace
the
reaction
roller
assembly
on
the
wheel
support
casting.
Set
the
reaction
roller
as
per
section
3.4.1.
Remove
the
four
blue
transportation
feet
from
the
hoist
legs
(Figure
13).
Summary of Contents for ZX6
Page 2: ......
Page 4: ...defgh Street Crane Co Ltd IV THIS PAGE IS INTENTIONALLY BLANK ...
Page 99: ...defgh Street Crane Co Ltd Ref D3256 rev B Page 99 of 103 NOTES ...
Page 100: ...defgh Street Crane Co Ltd Page 100 of 103 Ref D3256 rev B NOTES ...
Page 101: ......
Page 102: ......