38
Assembly of the roof implementation set
For the assembly of the roof implementation, the roof tiles have
to be removed at the assembly site.
The connection pipe will be conducted through the roof and
afterwards will be connected with the collector connection.
The bottom part of the roof implementation set will be extracted
with the lead apron.
The bottom part will be connected with the connection pipe and
fixed with screws.
1210900 roof feed-through set
1320303 connection pipe 2,5 m
1320304 connection pipe 15 m
1320311 safety pipe