39
Assembly of the roof implementation set
In the next step, the sheet metal cover will be slided from abo-
ve.
Finally, the delivered sealing wedge will be fixed in the upper
part of the roof implementation set. When fixing, you have to
pay attention that the underground (plate) is dry, dustless and
dirt-free!
Depending on the roofing, the fixation of the sealing wedge
might not apply (e. g. shingle roof).
In the last step, the roof tiles have to be inserted again.
If the assembly of a Drain Back system (STI SolBox) is going
to take place, the roof implementation (return pipe) has to be
mounted below the collector connection.