
Document No.:
985-007842
Revision: C
Effective Date: 21 May 2012
Odyssey Cinema
TM
Studio System
Installation
Verification and Testing
Page 6 of 9
“WARNING: This is a revision controlled document. Verify revision is correct prior to use.”
Stereotaxis, Inc
Confidential
No.
Test Description
Pass/Fail
Initials
6
Verify Peripheral Connections to the Odyssey Cinema Studio
Computer
•
Confirm Keyboard functions
•
Confirm Mouse functions
•
Confirm Headset functions (Put it on. Play an audio clip using
Windows Media Center. Confirm audio is heard.)
•
Confirm the Headset microphone functions
•
Confirm the Webcam functions (Start it and confirm webcam
video is displayed)
•
Confirm the Speakers function
.
P F
P F
P F
P F
P F
P F
_____
_____
_____
_____
_____
_____
3.3. Odyssey Cinema Studio Telepresence Verification (If Available)
No.
Test Description
Pass/Fail
Initials
1
Initiate a Telepresence connection between the Studio and lab.
Using Cinema on the Studio, connect to the same lab.
•
Confirm that when the lab’s layout includes Telepresence video,
it can be seen at the Studio.
•
Confirm that the audio from the Telepresence system can be
heard through the Studio headset and speakers.
P F
N/A
P F
N/A
_____
_____