
Document No.: 985-002307
Revision: D
EffectiveDate:07/24/2012
V
drive & Vdrive Duo
Installation Test
and Verification Procedure
Page 18 of 19
WARNING: This is a revision controlled document. Verify revision is correct prior to use
Stereotaxis, Inc.
Confidential
14.
Installation Completion Checklist
Section
Description
Pass/Fail Initials
6
Site Information and Document
Instructions
P F
7
Mechanical Installation and Upgrade for
RMS and OBUI
P F
8
Power On/Home Vdrive
P F
9
Homing Vdrive and Installing Handle
Clamp Assembly
P F
10
Vdrive movement from OBUI Screen
P F
11
Vdrive Movement from Control Room
3D Connexion Mouse
.
P F
12
Setup and Test from Navigant.
P F
13
E-Stop Functionality-Siemens
P F
N/A
13.1
E-Stop Functionality-Philips
P F
N/A
I hereby certify that the Niobe
®
Magnetic Navigation System is installed and functioning
within published specifications.
Stereotaxis Sign-off:
Sign Name: ___________________________ Date: _________________
Print Name: _________________________
Return a copy of the completed sections of this document along with all attachments to
Manager of Field/Tech Support.
Stereotaxis Management Sign off:
Sign Name:_____________________________ Date: __________________
Print Name:_____________________________