985-006001 REV. G Effective Date: 03 June 2008
Stereotaxis, Inc.
Page 11 of 43
3.3. System Homing
No.
Test Description
Pass/Fail
Initials
3
Verify that Homing of the system completes normally.
•
Force a request for homing by powering off the system.
•
Turn the system power back on and observe the message:
“The System Needs Homing – Press and Hold the Navigate
AP Button”.
•
Press and hold the Navigate AP button on the tableside
controller until homing completes.
•
Verify that the following icons are displayed during the Homing
process and all three yellow areas are blinking on right icon.
and
•
Verify that the homing command completes normally by
observing the “Homing Complete” message on the monitors.
P F
P F
P F
P F
P F
3.4. PM3.2 System Movements, Stowed, Retracted, Navigate AP, Navigate RAO,
Navigate LAO and Navigate with Offset.
No.
Test Description
Pass/Fail
Initials
4
Verify the system will move to Navigate AP position from the Stowed
position.
•
While the Positioner is in the Stowed position press and hold
Navigate AP position button:
on the tableside controller until the Positioner
reaches the Navigate position.
•
Verify that the Navigate AP Position indicator:
is displayed on the control room and
procedure room monitors.
•
Verify that while the Positioner is moving the green indicator
for the location the Positioner has been requested to move to
blinks during the move.
•
Verify that the total time to move to Navigate position does
not exceed 60 seconds.
P F
P F
P F
P F