
Document No.: 985-002307
Revision: D
EffectiveDate:07/24/2012
V
drive & Vdrive Duo
Installation Test
and Verification Procedure
Page 19 of 19
WARNING: This is a revision controlled document. Verify revision is correct prior to use
Stereotaxis, Inc.
Confidential
15.
REVISION HISTORY:
REVISION
ECO #
DATE
BRIEF DESCRIPTION
AUTHOR
A
10-414
2/8/2010
New Release
R. Hitchens
B
11-034
03/09/11
Updates
A. Miller
C
11-585
10-Nov-2011
Update to include Vdrive Duo
B. Kidd
D
12-073
07/24/2012
Add additional site information.
Edit for Clarity
A. Miller