EN
19
TABLE OF CONTENTS
20
Control Horn installation
21
Install the horizontal stabilizer
22
The transmitter and model setup
23
Install the main wing
26
Disassemble the spinner
27
Install the battery
SPECIFICATIONS
27
Install the receiver
28
Get your model ready to fly
28
Center of Gravity (CG)
29
Testing the control system
30
ESC Instructions
32
Declaration of Conformity
NEEDED TO COMPLETE
2408 (1700 kV)
ESC 20 A
(4) 9 GRAM
2S LiPo 1800mAh 7,4V 30C
Battery Charger
min. 4-Channel
min. 4-Channel
INSTALLED
19,2 dm²
(297.6 in²)
650 g
(22.9 oz)
863 mm (34 in)
1500 mm (59 in)
Summary of Contents for L-13 BLANIK
Page 1: ...BAUANLEITUNG INSTRUCTION MANUAL INSTRUCTIONS DE MONTAGE Art 031 4291 L 13 BLANIK...
Page 17: ...DE 17...
Page 33: ...EN 33...
Page 49: ...FR 49...
Page 50: ......
Page 51: ......
Page 52: ...2015 Gustav Staufenbiel GmbH...