922-126-3 (3’) TRIPLE RAIL SLIDE
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__5.
Attach slide legs
(3) to the bottom of the slide by inserting a
3/8” x ¾” bolt (9) and 3/8 washer (8) through the plate on the slide
leg (3) and into the factory installed nut on the underneath the exit
end of the slide (Detail B). Once all bolts are in place you can
tighten them. With help,
place the slide legs into the footing holes
and attach the slide to the playground deck,
__6. Using the 3/8 x 1 ¾ bolts (7) and 3/8 washers (8)
attach the
slide to the deck
by inserting the bolts and washers through the
holes in the deck and into the factory installed nuts at the entrance
to the slide (Detail C).
__7.
Measure up the playground post from the deck 38”
and
mark that location on both of the playground posts. This mark
represents the attachment point for the top of the slide guard
(reference the front view drawing on page 2).
__8.
Slide all four of the four-hole attachments brackets on to
the ends of the slide guard
(ensure the hole for the set screw on
the bracket is facing down). After you have put the brackets onto
the slide guard and attached the gaskets (5) put the slide guard in
place between the posts by lining up the top of the slide guard with
the mark you made on the post in step 7.
Attach the slide guard to
the posts
by screwing the self-tapping screws (6) through the four-
hole brackets and the gaskets and into the playground post using
the Torx bit and drill (Detail D). Repeat step on the remaining three
brackets.
TIP: It’s easier to install the self tapping screws if you pre drill
the holes in the post with a #7 drill bit by marking the hole
locations with a dry erase marker after you have put the guard
wall into position.
Detail C
Detail D
Summary of Contents for QUICK SHIP 1 MODIFIED
Page 1: ...012 3 4 5 2 67 8 9 8 0 5 4 6 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 1 MODIFIED Installation Guide...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION...
Page 42: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION...
Page 50: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION...
Page 64: ...September 17 2014 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION...
Page 81: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX...
Page 82: ......
Page 88: ......
Page 112: ......