March 10, 2014
1
912-242 SQUARE DECK 46”
INSTALLATION INSTRUCTION
INSTALLATION DETAILS
Recommended crew (Adult)
: 3
Installation time
: 15 min (.75 man hr)
User age
: 2-12
Use zone
: 72”
Weight
: 79
SURFACING: Use of safety surfacing in compliance with
ASTM specification F1292 is required.
MAINTENANCE:
As the owner of the playground you are responsible for
maintenance of the equipment and play area. A
maintenance schedule must be developed and the
equipment inspected frequently. A maintenance section
that includes component specific maintenance
requirements is included at the end of this manual.
Be sure to inspect surfacing for foreign objects that could
cause injury and that sufficient surfacing are in place in
accordance with ASTM and CPSC standards.
Summary of Contents for QUICK SHIP 1 MODIFIED
Page 1: ...012 3 4 5 2 67 8 9 8 0 5 4 6 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 1 MODIFIED Installation Guide...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 28: ......
Page 30: ......
Page 32: ......
Page 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION...
Page 42: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION...
Page 50: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION...
Page 64: ...September 17 2014 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION...
Page 81: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX...
Page 82: ......
Page 88: ......
Page 112: ......