
18
6.2. SHIFT/BRAKE
1
3
2
1
To install the chainstay housing guide, insert the locating tab into the non-drive side of the chainstay bridge cavity,
then pop it down so that it is flush with the bridge. Next, install the locator bolt until it bottoms out. Do not overtighten.
Make sure your brake and shift housings are long enough to reach all the way to the handlebar controls.
2
Route the brake and shift housings through the chainstays, starting at the dropout (shift) and middle of the
chainstay (brake), through the chainstay bridge clip, and exiting at the main pivot.
FOAM:
52cm
3
Continue routing the housings up the down tube, then guide them out the exit port at the head tube.
Install a “Churro” foam sleeve on each housing through the exit ports and into the down tube.
Summary of Contents for Stumpjumper FSR
Page 1: ...USER MANUAL...
Page 2: ......
Page 27: ......
Page 28: ...SPECIALIZED BICYCLE COMPONENTS 15130 Concord Circle Morgan Hill CA 95037 408 779 6229...