
Operating instructions BMK-20i | Heinz Soyer Bolzenschweißtechnik
29
7 Description of stud chuck
7.1
SRM
®
stud chuck
Each welding gun is provided with a stud chuck that matches the welding stud.
For the SRM
®
welding process, there are:
Adjustable stud chucks:
SRM
®
stud chuck M6
Order number:
F05307
SRM
®
stud chuck M8
Order number:
F05215
SRM
®
stud chuck M10
Order number:
F05217
SRM
®
stud chuck M12
Order number:
F05219
SRM
®
stud chuck M14
Order number:
F05353
SRM
®
stud chuck M16
Order number:
F05275
The stud chuck in the gun must be installed/changed in accordance with the stud
diameter.
Different stud diameters require different stud chucks.
Setting the SRM
®
stud chuck
SRM
®
stud chucks must be set to the length of the welding stud and, if necessary, to
the gun size.
The standard stud chuck is suitable for studs up to a length of 60 mm.
When using studs with a length > 45 mm, the stop screw
must be shortened. If the setting screw is too long, the stud
chuck cannot be fully inserted into the welding gun or the
lift test during welding cannot be carried out properly.
Summary of Contents for SRM EcoWeld BMK-20i
Page 2: ......