2-25 (E)
SRG-300SE/301SE
End
1. Reset this unit to the factory setting according to Section 2-1-6.
2. Turn off the power of each device and disconnect the connections.
2-8. FCB
Assembly
When removing or replacing the FCB assembly, perform the following procedure.
.
Writing of FCB adjustment data (Section 2-8-2)
2-8-1. Required Equipment/Tools
.
PC
t
For the operating environment, refer to “Required system configuration” in the user’s guide.
.
LAN cable
.
SDI monitor
t
Prepare the 3G-SDI compatible monitor.
Prepare the 3G-SDI level A mapping.
.
BNC cable
.
12 VDC power supply
.
Latest SNC toolbox
n
Install the SNC toolbox according to Section 2-1-2 in advance.
Summary of Contents for SRG-300SE
Page 1: ...HD COLOR VIDEO CAMERA SRG 300SE SRG 301SE SERVICE MANUAL 1st Edition ...
Page 6: ......
Page 70: ......
Page 83: ......