background image

The Grid Control option is disabled by default. Enabling it opens additional options in the menu.
For P(Q) diagram refer to 

https://www.solaredge.com/sites/default/files/application_

note_p_q_diagram_of_se_inverters_en_and_na.pdf

NOTE

SolarEdge inverters with “Grid Support” functionality (as marked on the inverter certification label), are 
compliant with UL 1741 Supplement A.. The functionality is built into the inverter and no additional 
external device is required.

Display

Select 

Display 

to set the following:

T e m p e r a t u r e   < C >

L C D   O n   T i m e   < 3 0 >

T L M   O n   T i m e   < 1 5 >

 

l

Temperature

: Select Celsius or Fahrenheit units.

 

l

LCD On Time <30>

: The number of seconds that the LCD backlight is ON after pressing the LCD light 

button. Set a value within the range of 10-120 seconds.

 

l

TLM On Time <15>

: The number of minutes that the LCD backlight is ON while viewing the Telemetry 

window. Set a value within the range of 1-120 minutes.

Maintenance

Select 

Maintenance 

to set the following options:

D a t e   a n d   T i m e

R e s e t   C o u n t e r s

F a c t o r y   R e s e t

F W   U p g r a d e

A F C I   < D i s >

D i a g n o s t i c s  

S t a n d b y   M o d e

G r i d   P r o t e c t i o n

B o a r d   R e p l a c e m e n t

 

l

Date and Time

: Set the internal real-time clock. If connected to the SolarEdge monitoring platform, 

the date and time are set automatically and only time zone should be set.

 

l

Reset Counters

: Resets the accumulated energy counters that are sent to the SolarEdge monitoring 

platform

 

l

Factory Reset

: Performs a general reset to the  default device settings.

 

l

FW Upgrade

: Perform a software upgrade  by using an SD card. Refer to 

upgrading_

an_inverter_using_micro_sd_card.pdf

.

Chapter 8: User Interface

SolarEdge

-

StorEdge Installation Guide MAN-01-00262-1.3

63

Summary of Contents for SE7600A-US

Page 1: ...SolarEdge StorEdge Solution with Backup Installation Guide For North America Version 1 3...

Page 2: ...50V DC to BAT connector DC and DC connections corrected in the connection diagram o Added a diagram of LG battery connection to inverter with 3 DIP switches l In Configuration Menu Options o Power Con...

Page 3: ...only and may vary depending on product models FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digitaldevice pursuant to part 15of the FCC Rules These li...

Page 4: ...per Power Optimizer Connection 19 Chapter 3 Installing the Inverter 20 Inverter Package Contents 20 Identifying the Inverter 20 Inverter Interfaces 21 Connection Unit 22 InternalAC Breaker and Bypass...

Page 5: ...er Using the LCD User Buttons 54 Configuring the Inverter Using the LCD Light Button 57 Configuration Menu Options 60 Country and Grid 60 Language 60 Communication 60 Power Control 62 Display 63 Maint...

Page 6: ...oubleshooting Ethernet Communication 93 Meter Troubleshooting 94 OK is not displayed 94 An error message is displayed 94 Power Wh Import value is not advancing 94 Battery Troubleshooting 95 Power Opti...

Page 7: ...dure that if not correctly performed or adhered to could result in injury or loss of life Do not proceed beyond a warning note until the indicated conditions are fully understood and met CAUTION Denot...

Page 8: ...r L unit ne doit tre ouverte que par un technicien qualifi dans le cadre de l installation et de la maintenance WARNING The Connection Unit meets all requirements for a code compliant installation of...

Page 9: ...fault protection NOTE The symbol appears at grounding points on the SolarEdge equipment This symbol is also used in this manual NOTE A SolarEdge inverter may be installed in a site with a generator h...

Page 10: ...tteinte avant et pendant le c blage Fermer l Le commutateur d alimentationauxiliaire l Le commutateur ducoupeur CAUTION This unit must be operated under the specified operating conditions as describe...

Page 11: ...StorEdge inverter for Single Battery or High Capacity o StorEdge inverter for High Power The Connection Unit located at the bottom of the inverter allows simple installation and connectivity to other...

Page 12: ...tional Battery NOTE l Additional SolarEdge inverters without batteries can be connected with RS485 The inverters will participate in export limitation and Smart Energy Management Connecting multiple i...

Page 13: ...s tothe Inverter on page 33 Step 5 Connecting the battery to the inverter and mounting the battery Refer to the installation information in the manufacturer documentation and to StorEdge Inverter Conn...

Page 14: ...ting bracket to the mounting surface o the power optimizer to the racking not required for smart modules l Wire cutters l Wire strippers l Voltmeter For installing the communication options you may al...

Page 15: ...be submerged in water Les optimiseurs de puissances sont compatibles la norme IP68 NEMA6P Choisissez le lieu de montage tel que l optimiseur ne puisse pas tre submerg par l eau CAUTION This unit must...

Page 16: ...f frame mounted power optimizers refer to http www solaredge com sites default files installing_ frame_mounted_power_optimizers pdf l The steps in this chapter refer to module add on power optimizers...

Page 17: ...lteraient peuvent endommager la optimiseur de puissance 3 Attach each power optimizer to the rack using the M6 1 4 stainless steelbolts nuts and washers or other appropriate mounting hardware Apply to...

Page 18: ...bracket Use mounting specific hardware as needed Apply torque of 9 5N m 7 lb ft See Figure 3 Figure 3 Power optimizer installation and grounding using a grounding plate l For mounting on un grounded s...

Page 19: ...mizer NOTE Images are for illustration purposes only Refer to the label on the product to identify the plus and minus input and output connectors For each of the power optimizers l Connect the Plus ou...

Page 20: ...r optimizers in the string in the same manner Figure 6 Power optimizers connected in series 3 If you intend to monitor the installation using the SolarEdge monitoring platform record the physicallocat...

Page 21: ...d the open circuit voltage VOC hold different meanings from those in traditionalsystems For more information about the SolarEdge system s string voltage and current refer to the VOC andISC inSolarEdge...

Page 22: ...n card l One 9V battery l Allen key for opening the Connection Unit l Installation guide with activation card and instructions Identifying the Inverter Refer to the sticker on the inverter that specif...

Page 23: ...ning it OFF reduces the power optimizer voltage to a low safety voltage and inhibits exportation of power When this switch is OFF the inverter controlcircuitry remains powered up l LCD panel displays...

Page 24: ...onductors of the PV and the positive and negative conductors of the battery l Openings for conduit entry Four openings are ready to use and have sealing covers Two openings are closed with drillguides...

Page 25: ...lity and use of each position Switch position Use Case Functionality 1 left Default Normal operation Normal operation The backed up loads panel is connected through the software controlled switches to...

Page 26: ...s side by side leave 8 20cm between inverters 2 Position the mounting bracket against the wall pole and mark the drilling hole locations o Ensure that the flat edge of the bracket is at the bottom as...

Page 27: ...Fasten the bracket using a standard bolt l Verify that the bracket is firmly attached to the mounting surface Figure 13 Connection Unit bracket 7 Insert the two supplied screws through the outer heat...

Page 28: ...e Connection Unit externalcover to the enclosure and lift the cover b Open the four internalscrews securing the transparent cover to the enclosure and remove the cover Figure 14 Inverter Covers SolarE...

Page 29: ...tions only Refer to the table on page 10 The auto transformer connects to the AC side of the inverter Since the inverter AC connections are on its right side it is recommended to position the auto tra...

Page 30: ...cket Lift the auto transformer from the sides or hold it at the top and bottom to lift the unit into place 4 Insert the two supplied screws through the outer heat sink fin on both sides of the auto tr...

Page 31: ...RS485wiring specifications l Cable type Min 3 wire shielded twisted pair a shielded Ethernet cable Cat5 5E STP may be used l Wire cross section area 0 2 1 mm 24 18AWG a CAT5cable may be used NOTE The...

Page 32: ...ngs must be suited for field wiring systems l The hubs and other fittings must comply with UL514B l Use the conduit and wiring appropriate for the installation location per the NEC l Outdoor installat...

Page 33: ...following figure shows the connections in the Connection Unit Figure 17 The Connection Unit connections Chapter 6 StorEdge Inverter Connections SolarEdge StorEdge Installation Guide MAN 01 00262 1 3...

Page 34: ...rd of the Connection Unit and connect it to the battery pad Figure 18 The battery holder Two 25A fuses are supplied with the high power inverters Installthe fuses in the holders on the top board of th...

Page 35: ...release the screwdriver to spring back and clamp the wire Check that the wire is fully inserted and cannot be pulled out easily CAUTION Ensure that the Plus wire s is connected to the terminal and tha...

Page 36: ...ecessary length between the Connection Unit and the battery for allcables The maximum distance between the battery and the inverter is 35ft 10m when using 24AWG 0 2mm2 cables for battery control l Tie...

Page 37: ...e round opening and release the screwdriver to spring back and clamp the wire DC cable 10 AWG 10 14 AWG 600V insulated BAT terminal block DC Control and monitoring 5 pin communication terminal block 6...

Page 38: ...Figure 21 Connections to LG Chem RESU10H battery Connection Unit with three DIP switches Connectingtothe Battery SolarEdge StorEdge Installation Guide MAN 01 00 262 1 3 36...

Page 39: ...Figure 22 Connections to LG Chem battery Connection Unit with two DIP switches SolarEdge StorEdge Installation Guide MAN 01 00 262 1 3 37 Connectingtothe Battery...

Page 40: ...lmeter in the RS485chain should be terminated with 120Ohm either internalor external l Inverter communication board Figure 23 o If a meter is installed No termination Left SW7switch Down o If a meter...

Page 41: ...auto transformer or auto transformer with over temperature sensor not connected ON up default ON up l In Connection Unit with three DIP switches Hardware configuration DIP switch 1 leftmost setup DIP...

Page 42: ...guide supplied with the meter Recommended cable type min max AWG Connection Unit Meter connection RS485 24 AWG 16 24 AWG shielded twisted pair 600V insulated Ext Devices 7 pin terminal block B A G RS4...

Page 43: ...n the following table Recommended cable type min max AWG Connection Unit connection Auto transformer connection Connection method AC 8 AWG 6 20 AWG 3 pin terminal block L1 Line terminal L1 Insert the...

Page 44: ...ck to open the connection hole insert the wire and release to spring back and clamp the wire Auto transformer o Insert a flat blade screwdriver into the square opening at the top of the terminal block...

Page 45: ...ing table Recommended cable type min max AWG Connection Unit con nection External connection Grid 6 AWG 4 20 AWG 3 pin terminal block Grid L1 Main distribution panel L1 3 pin terminal block Grid L2 Ma...

Page 46: ...er was operating properly power was produced by the power optimizers the following message is displayed D C V O L T A G E N O T S A F E D O N O T D I S C O N N E C T V D C 7 2 0 This message is displa...

Page 47: ...to damage internal components SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal Lors du retrait du couvercle assurez vous de ne pas endommager...

Page 48: ...fy that the card S N matches the inverter S N b Insert the card into the CARD slot on the communication board c Turn ON the AC switch of the main circuit board d LCD shows Running Script Done Figure 2...

Page 49: ...figuration refer to SystemConfigurationon page 81 7 Close the inverter cover by tightening the screws with a torque of 9 0N m 6 6lb ft For proper sealing first tighten the corner screws and then the t...

Page 50: ...he power optimizers Indicates connection to the power optimizers and that at least one power optimizer is sending monitoring data l 000 000 Appears only upon first telemetry reception from the power o...

Page 51: ...Wait for the completion of the pairing remaining seconds is 0 If pairing fails an error is displayed In this case repeat the pairing steps and refer to Power Optimizer Troubleshooting on page 96 If t...

Page 52: ...e AC output power produced 2 Take note of the serialnumber on the inverter labelusing the detachable 2D barcode sticker on each device This information is used in the SolarEdge monitoring platform to...

Page 53: ...rEdge monitoring platform willshow the logicallayout indicating which power optimizers are connected to which inverter but willnot show strings or the physicallocation of power optimizers The inverter...

Page 54: ...the SolarEdge Monitoring Platform Create the site in the monitoring platform using the registration form available at https monitoring solaredge us solaredge web p login Fillout allrequired informatio...

Page 55: ...d accepts a value change with a long press untilApplied is displayed The LCD screen displays status information of the system and various menus for configuration options The LCD paneland buttons are u...

Page 56: ...oltage is safe 50V Do not open the cover until the voltage is safe or until at least five minutes have passed La tension de s curit par d fault est de 50V Ne pas ouvrir le couvercle ou les connecteurs...

Page 57: ...m u n i c a t i o n P o w e r C o n t r o l B a c k u p C o n f D i s D i s p l a y M a i n t e n a n c e I n f o r m a t i o n Country U S A Language E n g l i s h G e r m a n S p a n i s h F r e n...

Page 58: ...C L C D O n T i m e 3 0 T L M O n T i m e 1 5 Maintenance D a t e a n d T i m e R e s e t C o u n t e r s F a c t o r y R e s e t F W U p g r a d e A F C I D i s D i a g n o s t i c s S t a n d b y M...

Page 59: ...sage is displayed K e e p h o l d i n g b u t t o n f o r p a i r i n g r e l e a s e t o e n t e r m e n u R e m a i n i n g 3 s e c Releasing the button displays the following menu O p t i m i z e r...

Page 60: ...F r e n c h I t a l i a n E x i t Communication1 S e r v e r L A N L A N C o n f R S 4 8 5 1 C o n f S Z i g B e e C o n f S W i F i C o n f N A G P I O C o n f M T R R S 2 3 2 C o n f C e l l u l a r...

Page 61: ...i s M a n u a l A F C I T e s t D i a g n o s t i c s S t a n d b y M o d e O p t i m i z e r C o n f G r i d P r o t e c t i o n B o a r d R e p l a c e m e n t E x i t The options presented in these...

Page 62: ...untry selection in the confirmation screen Toggle to YES and press Enter Language 1 Select the Language option to set the language in which the LCD should display 2 Confirm your language selection in...

Page 63: ...e LAN Conf I P C o n f i g S e t D H C P e n S e t I P S e t M a s k S e t G a t e w a y S e t D N S S e t S e r v e r A d d r S e t S e r v e r P o r t M o d b u s T C P D i s 1When using the SolarEd...

Page 64: ...PIO Conf D e v i c e T y p e R R C R Power Control For detailed information about active and reactive power controloptions refer to the Power ControlApplicationNote available on the SolarEdge website...

Page 65: ...s l TLM On Time 15 The number of minutes that the LCD backlight is ON while viewing the Telemetry window Set a value within the range of 1 120minutes Maintenance Select Maintenance to set the followin...

Page 66: ...to the instructions supplied with replacement kits Information Select Information to display the following options V e r s i o n s E r r o r L o g W a r n i n g l o g H a r d w a r e I D s l Versions...

Page 67: ...perature Energy Meter Status Displays the totalenergy produced during the last day month year and since inverter installation D a y W h 0 0 M o n t h K W h 0 0 Y e a r K W h 0 0 T o t a l K W h 0 0 l...

Page 68: ...itoring platform NOTE This data is accumulated according to an internal real time clock Telemetry Status This screen displays the last power optimizer telemetry received The display changes as each po...

Page 69: ...nected to the server l Status Displays OK if the inverter established successfulconnection and communication with the specified server port LAN RS485or ZigBee card l xxxxxxxx Eight bit Ethernet commun...

Page 70: ...ished a successfulphysicalconnection to the Cellular modem l S_OK The last communication to the SolarEdge monitoring platform was successful appears if the inverter is connected to the platform l Sig...

Page 71: ...cationnote ConnectinganElectricity Meter toSolarEdge Devices at http www solaredge com files pdfs solaredge meter installation guide na pdf o SS SunSpec for a non SolarEdge logger monitoring and contr...

Page 72: ...P U o Q U l Cos Phi The ratio between active to reactive power l Power Prod The power produced by the inverter For more information refer to the Power ControlApplicationNote available on the SolarEdge...

Page 73: ...m o t e S e t U n t i l d a t e l Name The TOU profile file name l Last Sync Date when the time of use profile was loaded from the monitoring platform l Source the source from which the TOU profile wa...

Page 74: ...he ON OFF switch at the bottom of the inverter is turned OFF and the AC is turned OFF When configuring the communication parameters make sure that the ON OFF switch is OFF and the AC is turned ON Lors...

Page 75: ...e communication board and has a 3 pin RS485terminalblock This Kit is provided with an installation guide which should be reviewed prior to connection see https www solaredge com sites default files RS...

Page 76: ...openings The table below describes the functionality of each opening Unused openings should remain sealed Gland Opening Functionality Cable Size diameter 1 PG16 One small External antenna cable 2 4 m...

Page 77: ...files rs485_surge_protection_kit_ installation_guide pdf If not using surge protection connect the grounding wire to the first inverter in the RS485 chain make sure the grounding wire is not in contac...

Page 78: ...White Blue White Blue Reserved 6 Green Orange Received 7 White Brown White Brown Reserved 8 Brown Brown Reserved Figure 36 Standard cable wiring 6 Use a pre crimped cable to connect via gland 1to the...

Page 79: ...age 60 NOTE If your network has a firewall you may need to configure it to enable the connection to the following address l Destination Address prod solaredge com l TCP Port 22222 22221 or 80 for inco...

Page 80: ...e to the grounding bus bar in the Connection Unit NOTE An additional RS485 port RS485 E is available from SolarEdge allowing configuration of multiple RS485 buses for communications in large sites Ref...

Page 81: ...lB pins and the same color for allG pins 6 For creating an RS485bus connect allB A and G pins in allinverters The following figure shows this connection schema Figure 40 Connecting the inverters in a...

Page 82: ...and configuring a communication option perform the following steps to check that the connection to the monitoring server has been successfully established 1 Close the inverter cover Attach the inverte...

Page 83: ...version is available for download at http solaredge com storedge firmware Upgrading the Inverter Firmware Version Upgrade the inverter firmware using a MicroSD card with the latest firmware version d...

Page 84: ...ection describes how to set up the RS485communication between the inverter meter and one battery For information on configuring two batteries refer to the StorEdge Applications ConnectionandConfigurat...

Page 85: ...0 M e t e r F u n c N o n e T o p o l o g y W y e 5 Configure the meter a Select Device Type Revenue Meter b Select Protocol WattNode c Verify that Device ID is set to 2 d Set the CT value that appear...

Page 86: ...Pack 8 To verify battery connection select Battery Info and check that the battery information is displayed If not check the wiring to the battery S N s e r i a l M o d e l X X X X X X N a m e p l a...

Page 87: ...installed the screen should show 3 3 If the number of devices under Prot does not match the number under refer to Troubleshootingon page 93 b Check the meter s In the meter s status screen check that...

Page 88: ...ation_guide_na pdf The Backup application can be used whether or not PV modules are installed at the site The backup function is disabled by default and can be enabled for on grid only application if...

Page 89: ...ergy control For more information refer to http www solaredge us files pdfs products export_limitation_application_note_NA pdf o E Export limit o P Production limit o I Minimum import o Dis Disabled n...

Page 90: ...C t r l M S C S e t O p e r a t i o n S t o r a g e C t r l 3 Optionally set the battery OFF periods as follows a Select Set Operation A list is displayed allowing 12monthly profile setup J a n O N F...

Page 91: ...charging the battery from AC Then you set up the levelof stored energy to be reserved for backup To set up Charge Discharge Profile TOU Backup Power 1 Access the Energy Ctrl menu as described above 2...

Page 92: ...To check the meter and inverter 1 Verify that AC is ON 2 Check the meter installed in export or consumption position CT arrows point to the grid a Turn the inverter ON OFF switch to OFF b Connect load...

Page 93: ...AC back ON from the main distribution panel The inverter should reconnect loads back to the grid To check Maximize Self consumption mode 1 Verify the inverter ON OFF switch is ON 2 Turn on as many lo...

Page 94: ...the Meter status screen is displaying import power close to zero c Press the externalLCD light button to display the Battery status screen and check that l State Charging l SOE percentage is increasi...

Page 95: ...meter are configured and communicating properly Troubleshooting Ethernet Communication When using Ethernet communication use the Server Communication Status window to identify the location of the err...

Page 96: ...e of the status screens the meter is not communicating with the inverter communication board Check the following l There are no loose connections at the inverter communication board and at the meter l...

Page 97: ...ttery communication is disconnected Check the following o The RS485controlconnection to the battery o The communication DIP switches settings on the battery o The ID DIP switches setting on the batter...

Page 98: ...e PROCEED WITH CARE A deviation of 1 per string is reasonable Si la tension mesuree est trop haute la tension basse de securite pourrait manquer dans l installation REDOUBLEZ DE PRECAUTION Une deviati...

Page 99: ...e is at least 200Vdc check when both inverter ON OFF switch and Connection Unit switch are ON You can check the status screen for the Vdc value l If allLEDs are OFF o Check that AC voltage exists in t...

Page 100: ...power no power to the backup loads while the inverter is producing power The main circuit breakers or loads circuit breakers in the backed up loads panel have been triggered Check that the backed up...

Page 101: ...on see Figure 10 o Check that the AC bypass switch in the Connection Unit is set to position 1 see Figure 10 Inverter without auto transformer On grid only The inverter does not start production and E...

Page 102: ...eating Shutdown non essential loads to reduce the phase imbalance If you use the inverter for on grid applications only without auto transformer move SW2 to the UP position ON refer to DIP Switch Setu...

Page 103: ...ayed in the initialstatus screen with the format Warning X For example V a c V V d c V P a c W 1 0 0 5 0 0 P _ O K X X X Y Y Y S _ O K W a r n i n g 8 O N The warning is a status screen To view the wa...

Page 104: ...Ceci inclus sans tre limit l utilisation de fixations comme des rivets vis clous inserts ou des broches Pour les juridictions ou un marquage de s curit est requis sur le couvercle du coupeur DC tels...

Page 105: ...d drillguides some of the drillguides may already be open but sealed The drillguides are located at the bottom and sides of the enclosure each with two sizes and 1 Open the required drillguides taking...

Page 106: ...Turn the Bypass switch inside the Connection Unit to position 2 in order to maintain power to the backed up loads 7 Disconnect the meter battery AC and DC wires from the Connection Unit 8 Remove the s...

Page 107: ...un dysfonctionnement est indiqu sur l cran LCD attendez cinq minutes pour que les condensateurs d entr e de l onduleur soient d charg s 2 Turn OFF the Connection Unit and the AC switch of the distribu...

Page 108: ...on Unit Open and remove the internaltransparent cover 5 Remove the faulty fuse from the upper board of the Connection Unit and replace with a new fuse 6 Close the Connection Unit cover s Figure 48 Con...

Page 109: ...eter to verify that DC voltage is below 50V at the battery connection 6 Disconnect the cables from the battery side and replace the battery 7 Connect the battery to the system as described in Connecti...

Page 110: ...Appendix D Mechanical Specifications Inverter Dimensions Figure 50 Inverter dimensions SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 108 Appendix D MechanicalSpecifications...

Page 111: ...Auto transformer Dimensions Figure 51 Auto transformer dimensions mm in Appendix D MechanicalSpecifications SolarEdge StorEdge Installation Guide MAN 01 00262 1 3 109...

Page 112: ...UT AC BACKUP POWER 3 Rated AC Power Output 50004 VA Max AC Power Output Surge 66004 VA AC Output Voltage Min Nom Max L L 211 240 264 Vac AC Output Voltage Min Nom Max L N 105 120 132 Vac AC Frequency...

Page 113: ...tery Types LG Chem RESU10H Number of Batteries per Inverter 13 Continuous Power 3300 5000 W Peak Power 5000 7000 W Max Input Current 8 5 17 5 DC Fuses on Plus and Minus 12A field replaceable 25A field...

Page 114: ...Backup conduit size AWG range 0 75 1 drill guides 14 6 AWG in AWG AC Input Auto transformer conduit size AWG range 0 75 1 14 6 AWG in AWG DC Input PV conduit size AWG range 0 75 14 8 AWG in AWG DC In...

Page 115: ...ower Up to 25A difference between phases Thermal Protection Yes INSTALLATION SPECIFICATIONS AC Output conduit size AWG range 0 75 14 10 in AWG Dimensions HxWxD 6 7 x 7 9 x 5 5 170 x 200 x 140 in mm We...

Page 116: ......

Reviews: