DIP Switch Setup
Verify that the DIP switches on the system components are set as described in this section, according to
the system hardware configuration.
DIP Switch Setup in Meter and Inverter
Termination and bias guidelines:
l
The last external meter in the RS485 chain should be terminated with 120 Ohm (either internal or
external).
l
Inverter communication board (
):
o
If a meter is installed: No termination - Left SW7 switch Down
o
If a meter is not installed: termination ON - Left SW7 switch Up (see also
Figure 23: RS485 termination switch on the inverter communication board
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.3
38
DIP Switch Setup