SECTION 1 - SYSTEM ARRIVAL
Page S1-14
2. Make note of any visible external damage on the shipping manifest to document
a potential claim against the carrier. If possible, when you find external damage,
make an internal inspection of the goods in the presence of the delivery person.
NOTE: Do not sign the receipt of the goods [manifest] until you are satisfied you
have received the goods intact [undamaged] and/or have documented
ON
the
manifest any claims you may have against the carrier.
3. File a claim with the carrier, immediately, if any internal damage to the
equipment is found.
INTERNAL INSPECTION
1. Remove the front plywood panel of the crate.
2. Remove the front foam insert.
3. Carefully rip open the plastic bag covering the PCS1.
4. Inspect to see that the motor is still in place and attached to the motor arms.
5. Inspect to see that the motor arms are still in place and attached to the venturi.
6. Inspect to see that no damage to the coil fins has occurred from shipping.
NOTE: internal damage caused by dropping the crate could sever one or more
motor mounting brackets which would free the motor and could cause fin
damage and damage to the fan blade, etc.
7. Verify the fan blade is free to rotate in the venturi and is not obstructed.
8. Remove the right panel to inspect the electronic control and valve(s).
9. Remove the rear panel to inspect the coilÕs pipe threads and fins if desired.
REUSE SHIPPING MATERIALS
The shipping materials can be reused in the installation of the PCS1. The
plywood can be used as a base in which the PCS1 can rest on and the foam can be
used under the PCS1 to dampen any vibration present from the PCS1. NOTE: a
small amount of vibration is normal from the PCS1 convection unit. Use of one or
more layers of foam under the PCS1 dampens this small vibration and prevents it
from radiating into and along rigid structures. The plywood can be further used in
the reframing of an attic access opening. Other uses of the crate materials become
obvious depending upon site conditions.
Summary of Contents for PCS1
Page 7: ...SECTION 1 SYSTEM ARRIVAL Page S1 1 SECTION ONE SYSTEM ARRIVAL...
Page 22: ...SECTION 2 HEATING DATA Page S2 1 SECTION TWO HEATING DATA...
Page 28: ...BTUS Vs GPM BTUS Vs T SECTION 2 HEATING DATA Page S2 7...
Page 34: ...SECTION 3 INSTALLATION Page S3 1 SECTION THREE INSTALLATION...
Page 65: ...Attic Installation Photos SECTION 3 INSTALLATION Page S3 31...
Page 66: ...Attic Installation Photos SECTION 3 INSTALLATION Page S3 32...
Page 88: ...SECTION 4 SERVICE Page S4 1 SECTION FOUR SERVICE...
Page 99: ...Common Questions Page 1 of 10 COMMON QUESTIONS...
Page 109: ...Dictionary of Terms Page 1 of 4 DICTIONARY OF TERMS...