IT
ALIANO
ENGLISH
8
IOMMASGPXX00-GB_01
Green Power
100-120 kVA
3
REQUISITES
The packaging guarantees the stability of the UPS during shipping and physical transfer. Carry the packaged unit as
close as possible to the installation site.
When moving the unit on even slightly sloping surfaces, use the blocking equipment and break-
ing devices to ensure that the unit does not fall over.
3.1 SHIPPING AND MOVING.
• The UPS must remain in a vertical position during all shipping and moving operations.
• Ensure that the fl oor is strong enough to support the weight of the UPS and of the battery cabinet, if used.
Avoid moving the unit by putting pressure on the front door.
The UPS MUST be handled with the utmost care by at least two people.
CAUTION IF DAMAGED.
Packages, crushed, punctured, or torn such that contents are revealed must be set aside in an isolated area
and inspected by a qualifi ed person. If the package is deemed to be not shippable, the contents must be
promptly collected, segregated, and either the consignor or consignee contacted.
All packaging material must be recycled in compliance with the laws in force in the country where
the system is installed.
Summary of Contents for Green Power 100
Page 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Page 2: ......
Page 64: ...FRANÇAIS ...