IT
ALIANO
ENGLISH
26
IOMMASGPXX00-GB_01
Green Power
100-120 kVA
UNPACKING AND INSTALLATION
4
4.8 ISOLATION TRANSFORMER.
If an external isolation transformer cabinet is required, the following instructions should be followed:
• Refer to chapters 2 and 3 of this manual for indications on moving and installing the cabinet.
• See paragraph 3.4 for details about protections.
• The protection cable marked with the ground symbol is connected directly to the distribution panel.
• The transformer can either be connected to the UPS input or output.
The UPS must not operate without the neutral connection to the input.
The transformer cannot be connected to the output on single UPS unit connected in parallel con-
fi guration.
For details of the connections, refer to the transformer terminal board diagram.
Summary of Contents for Green Power 100
Page 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Page 2: ......
Page 64: ...FRANÇAIS ...