UNPACKING AND INSTALLATION
4.9.1-1
20 m max
25 m max
ON INVERTER
UPS
Eco
1025kVA
10:30
?
ON INVERTER
UPS
Eco
1025kVA
10:30
?
4.9.1 Recommended 1+1 parallel confi guration.
Legend.
A
Selective general diff erential magneto thermal
switch.
B
“Parallel bus” cable.
C
Single UPS magneto-thermal switch (if a
separate auxiliary power source is used, add a
magneto-thermal switch for each UPS).
D
Additional disconnectors on the distribution
panel.
E
System shutdown switch.
F
Distribution.
A
UPS1
UPS2
B
C
C
D
E