UPMAST TRANS CEIVER (CAEA37) AND
TURN ING MECH A NISM (CAE-A42/41)
27
The Upmast Transceiver/Turn
ing Mech
a
nism is
sup plied in two parts:
(1) Transceiver with gearbox.
(2) Antenna.
28
The ship’s mount
ing struc
ture must be ca
pa
ble of
with
stand
ing the high start
ing and stop
ping torque
g e n
e r
a t e d b y t h e m o
t o r f i t
t e d i n t h e u p m a s t
trans ceiver/turn ing mech a nism.
29
When mount
ing the upmast turn
ing mech
a
nism
ob serve the fol low ing:
(1) Use the fitting pack supplied with the equipment
(refer to Figure 4d). The fitting pack contains
fixings that have been tested to withstand the
stresses detailed in paragraph 33.
(2) Recommended tensile strengths and torque
loadings for the fixings are stated on the
installation diagram.
(3) For upmast transceivers/turning mechanisms
mounted in excess of 1.8m above the deck, it is
recommended that a service platform and guard
rail are fitted.
(4) Use a suitable jointing compound or sealant to
prevent corrosion between the platform and
upmast transceivers/turning mechanism.
(5) Any chipped or damaged surfaces must be
painted with polyurethane paint.
30
With ref er ence to Fig ures 4d and 5d, in stall the upmast
turn ing mech a nism as fol lows:
(1) Fit the coupling element and sealing ring to the
antenna connector.
(2) Fit the antenna to the upmast turning mechanism,
ensuring that the connectors are aligned, and
loosely secure using the eight M10 retaining bolts,
washers and nuts.
(3) Secure the co-axial connector using the three M6
bolts and washers provided.
(4) Tighten and torque load the eight antenna
retaining bolts to 25 Nm.
(5) Fit the spoilers to the antenna using the fittings
supplied.
(6) Mark out and drill four 17mm gearbox mounting
holes at the mounting position.
(7) For semi-rigid cable access mark out and drill a
100 mm hole in the mounting platform, as shown
on Figure 4d.
NOTE:
The upmast transceiver/turning mechanism is supplied
with four M12 bolts, washers and fibre washers. These may
be removed, but not discarded, and replaced with eye bolts.
Once the upmast transceiver/turning mechanism is in
position, the eye bolts are to be removed and replaced with
the original bolts.
Original
4d.7
May 01
KH 2020
Chap 4d
CAU TION
When Un
packing The An
tenna, En
sure That The
Semi-rigid Co-axial Ca bles Are Not Kinked, Crushed
Or Bent. Sup port The An tenna Near Its Cen tre When
Lifting It Out Of Its Packing And When Fitting It Into
Po si tion On The Turn ing Mech a nism. Do Not Han dle
The An tenna By The Semi-rigid Co-axial Ca ble In put.
CAU TION
The An tenna Win dow Must NOT Be Painted.
CAUTION
When Ro tating The An tenna Do Not Ap ply Ex ces sive
Force.
En sure that the Semi-rigid Coax As sem bly, on The
Un
der
side Of The An
tenna, Is Not Crushed Or
Dam aged.
CAU TION
Fail
ure To Fit An
tenna Spoilers Will Re
duce
Sys tem Life And Ren der The Ra dar In op er a tive
In High Winds.
Summary of Contents for Kelvin Hughes Nucleus 3 5000 Series
Page 27: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 ii Amdt 1 KH 2020 Index Introduction ...
Page 73: ...THIS PAGE IS INTENTIONALLY BLANK KH 2020 Chap 2a July 03 2a 6 Amdt 5 ...
Page 101: ...THIS PAGE IS INTENTIONALLY BLANK May 01 3 6 Original KH 2020 Chap 3 ...
Page 109: ...THIS PAGE INTENTIONALLY BLANK July 03 viii Amdt 5 KH 2020 Index Chap 1 3 ...
Page 119: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 x Amdt 1 KH 2020 Contents Chap 4 5 ...
Page 150: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4b 12 Original KH 2020 Chap 4b ...
Page 157: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 6 Original KH 2020 Chap 4c ...
Page 163: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 14 Original KH 2020 Chap 4c ...
Page 176: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4c 28 Original KH 2020 Chap 4c ...
Page 234: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4f 6 Original KH 2020 Chap 4f ...
Page 257: ...THIS PAGE IS INTENTIONALLY BLANK May 01 4f 30 Original KH 2020 Chap 4f ...
Page 275: ...THIS PAGE IS INTENTIONALLY BLANK July 03 5 18 Amdt 5 KH 2020 Chap 5 ...
Page 279: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 iv Amdt 1 KH 2020 Index Chap 4 5 ...
Page 309: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 xiv Amdt 1 KH 2020 Contents Chap 7 8 ...
Page 356: ...Original 7c 19 May 01 KH 2020 Chap 7c CD 2413 Figure 16c Modulator PCB Switches Test Points ...
Page 359: ...THIS PAGE IS INTENTIONALLY BLANK May 01 7c 22 Original KH 2020 Chap 7c ...
Page 381: ...THIS PAGE IS INTENTIONALLY BLANK Sep 01 7d 26 Amdt 1 KH 2020 Chap 7d ...
Page 425: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8a 22 Original KH 2020 Chap 8a ...
Page 445: ...THIS PAGE INTENTIONALLY BLANK July 03 8aA 16 Amdt 5 KH 2020 Chap 8a Annex A ...
Page 463: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8c 12 Original KH 2020 Chap 8c ...
Page 472: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8c 22 Original KH 2020 Chap 8c ...
Page 476: ...THIS PAGE IS INTENTIONALLY BLANK May 01 8d 4 Original KH 2020 Chap 8d ...
Page 498: ...THIS PAGE IS INTENTIONALLY BLANK Original 8e 19 May 01 KH 2020 Chap 8e ...