Maintenance
5
-22
5
Important
- When the sealing bracket is assembled, please secure the bolts in the following order.
1). Half-fasten 4 bolts (
①,②,③,④
) in order of number (not fully fastened)
2). 3bolts (
②,③,④
) are Half-fastened counterclockwise from
①
(not completely fastened).
3). Completely tighten all bolts counterclockwise starting from bolt
①
6
Installing the resin tank
Check if any contaminants, fingerprint, or dirt remain in the release film. If everything is OK, install the resin tank.
7
Leveling the platform
Once the resin tank is installed, proceed with the platform leveling process again to adjust the alignment between
the platform and the resin tank. For details on platform leveling, refer to “Platform Leveling of 3. UI Menu Function”.
If replacing the power cord set, please use the power cord set with the same rated. Refer to the below regarding the
ratings.
- Plug : 250Va.c., 16A
- Cable : 3G X 1.0mm
2
, 300/500V
- Connector : 250Va.c., 10A
We recommend that you purchase the power cord set which we provide with the machine in the box if possible.
①
②
③
④
Summary of Contents for A1SD Series
Page 28: ......
Page 29: ...1 Preparation for Machine Operation Sindoh A1SD Series USER MANUAL ...
Page 40: ......
Page 41: ...2 UI Menu Function Sindoh A1SD Series USER MANUAL ...
Page 92: ......
Page 93: ...3 Printing Sindoh A1SD Series USER MANUAL ...
Page 106: ......
Page 107: ...4 Checking Printed Output Sindoh A1SD Series USER MANUAL ...
Page 117: ...Maintenance 5 Sindoh A1SD Series ...
Page 142: ......