![Sinclair ASCU-12A Service Manual Download Page 80](http://html.mh-extra.com/html/sinclair/ascu-12a/ascu-12a_service-manual_1280121080.webp)
U-MATCH AIR CONDITIONERS INSTALLATION
78
2
)
Vacuum-pumping and leak detection
Dismantle the bonnet of refrigerant valve and air valve.
Align with the center of piping and adequately tighten nuts of connecting pipes by hand
Tighten the nuts with a spanner.
Remove the one way valve cap of air valve.
Unscrew the spool of refrigerant valve for 1/4 turn with a socket head wrench, and at the
same time push up the spool of air valve with a screwdriver to let air give off.
Air exhaust continues for 15 seconds until coolant gas appears, immediately shut off one way
valve and tighten the valve cap.
Totally open the spool of refrigerant valve and air value (as shown in Figure 3-1-4)
Figure 3-1-4
Tighten the valve caps and use soapy water or a leak detector to check any leakage on indoor
unit, outdoor unit and connection parts of pipes.
Caution
:
If conditions are allowed, a vacuum pump shall be used for drawing off air inside the system at a
valve. Method for creation of vacuum by using a vacuum pump is as follows:
Take out the nut cover of the inlet for refrigerant.
Connect the tube of the vacuum watch with the vacuum pump, having the low-pressure end
linking to the inlet for refrigerant. (As shown in Figure 3-1-5)
Summary of Contents for ASCU-12A
Page 1: ...SERVICE MANUAL INDOOR UNITS ASCU A ASDU A ASFU A UNI ON OFF SERIE OUTDOOR UNITS ASGE A ...
Page 2: ......
Page 3: ...1 PRODUCT ...
Page 24: ...U MATCH AIR CONDITIONERS PRODUCT 23 5 PIPING DIAGRAM ...
Page 25: ...24 CONTROL ...
Page 26: ...U MATCH AIR CONDITIONERS CONTROL 25 CONTROL 1 OPERATION FLOWCHART 1 1 Cooling Dry Operation ...
Page 27: ...U MATCH AIR CONDITIONERS CONTROL 26 1 2 Heating Operation ...
Page 45: ...U MATCH AIR CONDITIONERS CONTROL 44 5 2 4 Dimensions ...
Page 48: ...GREE COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 47 INSTALLATION ...
Page 59: ......
Page 91: ...Model ASFU 60A ...
Page 93: ...GREE COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 91 MAINTENANCE ...
Page 160: ...PARTS GUIDE CASSETTE FLOOR CEILING DUCT UNITS OUTDOOR UNITS UNI ON OFF ...
Page 161: ......
Page 165: ...MAINTENANCE 162 2 Model ASGE 24A ASGE 24A WK Exploded Views ...
Page 167: ...MAINTENANCE 165 3 Model ASGE 36A Exploded Views ...
Page 169: ...ASGE 36A WK ...
Page 172: ...MAINTENANCE 168 4 Model ASGE 42A ASGE 42A WK Exploded Views ...
Page 174: ...MAINTENANCE 171 5 Model ASGE 48A ASGE 48A WK Exploded Views ...
Page 176: ...Model ASGE 60A WK ...
Page 187: ...U MATCH AIR CONDITIONERS MAINTENANCE 174 6 Model ASDU 60A Exploded Views ...
Page 191: ...MAINTENANCE 186 2 Model ASCU 24A ASCU 36A ASCU 42A ASCU 48A Exploded Views ...
Page 194: ...MAINTENANCE 189 5 2 3 Ceiling Type 1 Model ASFU 09A ASFU 12A ASFU 18A Exploded Views ...
Page 197: ...MAINTENANCE 192 2 Model ASFU 24A Exploded Views ...
Page 200: ...MAINTENANCE 195 3 Model ASFU 36A ASFU 42A ASFU 48A Exploded Views ...