28
Commissioning Checklist for Murelle
110
BOX ErP
Singl
e
B
oilers
a
nd B
oilers
i
n
C
ascade
This checklist is for guidance only, and is not a full installaon safety che
ck
Add
res
s
Commisioning
e
ta
D
re
eni
gn
E
Signature
All
S
ystems
Has t
he system
b
een
flus
he
d an
d c
leane
d
in acco
rd
ance w
ith
BS7593 an
d manu
factureres recomme
nd
at
ion
s?
YES
What system cleanser was used? What inhibiter was used
?Q
uanty
L
itres
.
12345678
Sasfactory visual check of flue Y/N Flue within allowable length and correctly terminated Y/
N
Confirm Tightness of installaon pipework downstream of Isolang valve using leak detecon fluid Y/
N
Check ghtness of all valves Y/N Carryout ignion test of boiler with gas isolated
to ensure boiler fails safe Y/
N
Turn on gas supply to boiler and isolate main burner(disconnect gas valve
)
and ensure boiler goes to lockout Y/N Reset boiler lockout and retry, ensuring boiler again locks out Y/N Reconnect gas valve, reset boiler lockout, and ensure boiler lights and is stable Y/N Test safety devices Y/
N
Safety stat(TS) - Disconnect - the boiler locks out Y/
N
Flue analysis
Boiler
1B
oiler
2B
oiler
3B
oiler
4B
oiler
5B
oiler
6B
oiler
7B
oiler 8
Boiler Output
M
in
Max
Mi
nM
ax
Mi
nM
ax
Mi
nM
ax
Min
Max
Min
Max
Mi
nM
ax
Mi
nM
ax
CO ppm CO2 %
Rao
Boiler size
Serial Numbe
r
Completed By
Date