SVD 800 HD
19
ENGLISHENGLISHENGLISHENGLISHENGLISH
Turn the projector upside down and hang on the ceiling
with the assembly brackets
Tilt the projector to centre the vertical picture and screw
the two securing screws (H)
Note: Insert the special curved washers between the
ceiling bracket and the securing screws. For a correct
installation the concave surface of the washer should be
towards the bracket. For safety purposes, use only the
assembly kit supplied.
Fix the bracket, included in the pack, to the ceiling with
the four screws supplied.
Attention:
The bracket must be fixed properly and be
absolutely parallel with the screen
Put the projector on a table in the vertical position
(sideways)
N.B.: Take the two front feet off.
Remove the 2 screws and their washers, insert the left
bracket and fix it, using the same screws and washers,
as illustrated in the following figure.
Repeat for the right bracket.
Fig. 46
SCREEN
FRONT
440
93
=
=
OBSERVE
PARALLELISM
BRACKET
Fig. 47
Note: the tilting angle between the base plane of the
projector and the lenses’ axis should be 14
°
.
Fig. 48
E
D
14
°
SCREEN CENTRE
SCREEN
WALL
Fig. 49
TABLE 3: CEILING FRONT PROJECTION.
D = Distance between the line of the first hole of the
assembly bracket and the screen.
E = Distance between the ceiling and the screen centre.
SCREEN SIZE
D
E
USEFUL AREA 4/3
Diagonal
Width
Height
(Inches)
(cm.)
(cm.)
(cm.)
(cm.)
60”
121.9
91.4
204
81
80”
162.5
121.9
258
95
90”
182.9
137.2
284
104
100”
203.2
152.4
312
109
120”
243.8
182.9
366
125
150”
304.8
228.6
447
146
180”
365.7
274.3
528
167
200”
406.4
304.8
582
181
250”
508.0
381.0
718
217
300”
609.6
457.2
853
251
H
FRONT
Note:
For 16/9 screen formats, measure the width and
refer to the nearest width value in the table.
Summary of Contents for SVD 800 HD
Page 44: ......