Control During Operation
6
You will learn in this chapter how to monitor and operate the SIPROTEC 7SS52 V4
distributed busbar and breaker failure protection.
You can use the DIGSI Plant Visualization to visually monitor the substation during op-
eration. The Plant Visualization enables the measured values and switch states to be
displayed in on-line mode.
During operation you can also
•
read out annunciations, operational values, and fault data,
•
influence single functions and annunciations.
As a prerequisite the plant must be configured as described in Chapter 4, page 45 and
the input and output functions must be allocated.
Please note that the examples given are held in a general context and may deviate in
word and in detail from the devices you are using. It is also possible that not all func-
tions are available
−
depending on the model variant used.