
Connecting up, switching on
4.4 Installation set for line-side cable connection, left
Power Module PM330
Hardware Installation Manual, 10/2016, A5E32844552B AD
45
2.
Mount the installation set for connections U1, V1, W1
②
, tightening torque: 50 Nm and
the installation set
③
, tightening torque: 6 Nm.
Tightening torque for screw
④
: 3 Nm
Figure 4-10 Installing the mounting kit, step 2
Summary of Contents for SINAMICS G120P PM330
Page 1: ......
Page 2: ......
Page 18: ...Introduction Power Module PM330 18 Hardware Installation Manual 10 2016 A5E32844552B AD ...
Page 97: ......
Page 98: ......