Connecting up, switching on
4.4 Installation set for line-side cable connection, left
Power Module PM330
Hardware Installation Manual, 10/2016, A5E32844552B AD
43
3.
Final state with mounted installation set, tightening torque for the fixing screws
③
: 50 Nm
Figure 4-7
Installing the mounting kit, step 3
4.
The cable entry protection
④
must be broken out corresponding to the diameter of the
cable to be introduced.
Figure 4-8
Installing the mounting kit, step 4
Summary of Contents for SINAMICS G120P PM330
Page 1: ......
Page 2: ......
Page 18: ...Introduction Power Module PM330 18 Hardware Installation Manual 10 2016 A5E32844552B AD ...
Page 97: ......
Page 98: ......