Commissioning
5.6 Commissioning with STARTER
SINAMICS G110D
70
Operating Instructions, 07/2016, FW V3.63, A5E36768472B AB
Commissioning procedure
Once STARTER is running it will present an empty screen - from the File menu selected new
project.
Image 5-3
Create new project dialog
Click OK and the dialog disappears and the normal STARTER screen appears with the
project name appears in the project tree on the right-hand side of the screen.
Image 5-4
Insert drive
Double-click the "Insert single drive unit"; the select drive dialog appears.