Commissioning
5.6 Commissioning with STARTER
SINAMICS G110D
78
Operating Instructions, 07/2016, FW V3.63, A5E36768472B AB
To complete the basic commissioning of the Inverter, the following tasks must be completed:
●
Ensure that the Inverter and motor are powered-up (no run command should be issued).
●
Ensure that the Inverter is correctly connected to the PC, using the appropriate
communications cable.
In the project tree under commissioning, select "Control panel". The control panel will appear
at the bottom of the screen.
Image 5-18 Control panel activation
Press the Start [I] button and the motor calculation will be performed. When this has been
completed, the basic commissioning of the Inverter and motor has been completed.
Image 5-19 STARTER control panel
Summary of Contents for SINAMICS G110D
Page 1: ......
Page 2: ......
Page 8: ...Table of contents SINAMICS G110D 8 Operating Instructions 07 2016 FW V3 63 A5E36768472B AB ...
Page 223: ......
Page 224: ......