
S7-300 Programmable Controller Hardware and Installation
A5E00105492-01
4-1
4
Configuring
4
4.1
In this Chapter
In this chapter
we show you,
•
how to configure your mechanical assembly,
•
how to configure your electrical assembly,
•
what you need to consider for networking.
Manuals for further details
For information on network topics we recommend the Manual Communication with
SIMATIC. This manual contains important notes on networking for SIMATIC
professionals as well as the basics for newcomers.
In the appendix you can find ...
•
Information on ambient conditions (Appendix: Ambient Conditions)
•
Information on special protective measures (Appendix: Electrical protective
measures); e.g. protection against inductive surge voltage, lightning, etc.
4.2 Basics
Warning
Open components
S7-300 modules are open components. That means, you must always install the
S7-300 in cubicles, cabinets or electrical operating rooms accessible only with the
help of a key or tool. Only trained or authorized personnel is allowed access to
these cubicles, cabinets or electrical operating rooms.
Summary of Contents for Simatic S7-300
Page 10: ...Contents S7 300 Programmable Controller Hardware and Installation x A5E00105492 01 ...
Page 16: ...Preface S7 300 Programmable Controller Hardware and Installation 1 6 A5E00105492 01 ...
Page 22: ...Quick Guide S7 300 Programmable Controller Hardware and Installation 2 6 A5E00105492 01 ...
Page 28: ...Product overview S7 300 Programmable Controller Hardware and Installation 3 6 A5E00105492 01 ...
Page 74: ...Configuring S7 300 Programmable Controller Hardware and Installation 4 46 A5E00105492 01 ...
Page 102: ...Wiring S7 300 Programmable Controller Hardware and Installation 6 18 A5E00105492 01 ...
Page 148: ...Commissioning S7 300 Programmable Controller Hardware and Installation 8 36 A5E00105492 01 ...
Page 236: ...Glossary S7 300 Programmable Controller Hardware and Installation 12 16 A5E00105492 01 ...