
S7-300 Programmable Controller Hardware and Installation
A5E00105492-01
8-1
8
Commissioning
8
8.1
In this Chapter
In this chapter
contains notes on commissioning which you should take into account in order to
avoid personal injury or damage to machines.
Note
Since your commissioning phase is determined primarily by your application, we
can only offer you general information, without claiming completeness of this topic.
Always note ...
the information on commissioning in the description of your system elements and
devices.
8.2 Commissioning
procedure
Software requirements
To utilize the full functional scope of the CPUs, you require
•
STEP 7 as of V 5.1 + SP 2 for CPUs 31xC
•
STEP 7 as of V 5.x for all other CPUs
Prerequisites for commissioning
•
S7-300
is
installed
•
S7-300
is
wired
•
With networked S7-300:
–
MPI/PROFIBUS addresses are configured
–
The segments are terminated with active terminating resistors
Summary of Contents for Simatic S7-300
Page 10: ...Contents S7 300 Programmable Controller Hardware and Installation x A5E00105492 01 ...
Page 16: ...Preface S7 300 Programmable Controller Hardware and Installation 1 6 A5E00105492 01 ...
Page 22: ...Quick Guide S7 300 Programmable Controller Hardware and Installation 2 6 A5E00105492 01 ...
Page 28: ...Product overview S7 300 Programmable Controller Hardware and Installation 3 6 A5E00105492 01 ...
Page 74: ...Configuring S7 300 Programmable Controller Hardware and Installation 4 46 A5E00105492 01 ...
Page 102: ...Wiring S7 300 Programmable Controller Hardware and Installation 6 18 A5E00105492 01 ...
Page 148: ...Commissioning S7 300 Programmable Controller Hardware and Installation 8 36 A5E00105492 01 ...
Page 236: ...Glossary S7 300 Programmable Controller Hardware and Installation 12 16 A5E00105492 01 ...