Filling the cooling circuit
1. Fill the cooling circuit with water until the air is completely forced out of the cooling circuit.
2. Perform a pressure check to see whether the cooling water supply is airtight. In doing so,
do not exceed the maximum test pressure. The maximum permissible pressure can be
found on the rating plate.
If you do not then put the machine into operation, you must implement the measures necessary
during stoppages.
NOTICE
Bleed air from the cooling ducts
If the cooling ducts are not completely filled with water, sufficient machine cooling cannot be
guaranteed and the machine may overheat.
Ensure that the air is bled from the cooling ducts during filling and that the cooling ducts are
completely filled with water.
Assembling
5.4 Cooling water supply for machines with water cooling
LOHER CHEMSTAR 1PS5
Operating Instructions 03/2014
53
Summary of Contents for SIMATIC S5 1P 243
Page 2: ...11 03 2014 02 49 V4 00 ...
Page 12: ...Introduction LOHER CHEMSTAR 1PS5 12 Operating Instructions 03 2014 ...
Page 20: ...Safety notes 2 11 Ventilation LOHER CHEMSTAR 1PS5 20 Operating Instructions 03 2014 ...
Page 66: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS5 66 Operating Instructions 03 2014 ...
Page 124: ...Disposal 11 4 Disposal of components LOHER CHEMSTAR 1PS5 124 Operating Instructions 03 2014 ...
Page 136: ...Quality documents C 4 Data LOHER CHEMSTAR 1PS5 136 Operating Instructions 03 2014 ...
Page 140: ...Index LOHER CHEMSTAR 1PS5 140 Operating Instructions 03 2014 ...
Page 141: ...AC EC Declaration of Conformity U161 AB EC Declaration of Conformity U163 AA R No 20000h U165 ...