SIMATIC PN/J1939 LINK
Operating Instructions, 12/2018, A5E45307564-AA
43
Commissioning
8
8.1
Commissioning PN/J1939 LINK
Prerequisites
●
The PN/J1939 LINK is mounted and connected to a SIMATIC S7 CPU via PROFINET.
●
The J1939 bus is connected to the PN/J1939 LINK.
●
PN/J1939 LINK and all other components are wired and connected.
Basic commissioning procedure
After commissioning of the hardware perform the additional steps required for
commissioning in the TIA Portal.
TIA Portal
1.
Install the GSDML file. This step integrates the PN/J1939 LINK in the HW catalog (for
details, see Configuring / programming (Page 45)).
2.
Assign a PROFINET device name and an IP address to the PN/J1939 LINK.
3.
Create a project
4.
Configuration using GSDML file in the TIA Portal (see also Configuring / programming
(Page 45)).
5.
Download project to the S7 CPU
6.
Set SIMATIC CPU to "RUN" operating state. The corresponding configuration data is
downloaded automatically from the S7 CPU to the PN/J1939 LINK.
7.
When the S7 program sets the control bit in the cyclic IO image to "1", the left "RUN"
status LED on the PN/J1939 LINK lights up green and signals that the device is in an
error-free operating state.
Result
PN/J1939 LINK was successfully commissioned.
Summary of Contents for SIMATIC PN/J1939 LINK
Page 1: ...SIEMENS siemens com ...
Page 2: ......