SIMATIC PN/J1939 LINK
Operating Instructions, 12/2018, A5E45307564-AA
45
Configuring / programming
9
9.1
Overview
The configuration of PN/J1939 LINK gateway is made in the TIA Portal and essentially
consists of the following work procedure:
1.
Integrate PN/J1939 LINK from the HW catalog into the project
2.
Connect S7 control and PN/J1939 LINK via PROFINET
3.
Set the PROFINET-specific parameters.
4.
PN/J1939 LINK assign parameters
5.
Insert and configure parameter groups
6.
Checking and compiling the configuration
The following instructions are intended to show the basic procedure for configuring the
PN/J1939 LINK and provide a quick introduction to configuring PN/J1939 LINK.
The description refers to TIA Portal V15.
9.2
Devices & networks
Requirement
Check whether the hardware catalog of the TIA Portal contains PN/J1939 LINK. Otherwise,
you have to integrate PN/J1939 LINK by installing a GSDML file.
The GSDML file "GSDML-V2.32-Siemens-PN_J1939_LINK-yyyymmdd.xml" is available for
TIA Portal V15 at "Industry Online Support
http://www.siemens.com/automation/service&support
)".
The GSDML file is installed in the TIA Portal via "Options >
Manage generic description files (GSD)".
Summary of Contents for SIMATIC PN/J1939 LINK
Page 1: ...SIEMENS siemens com ...
Page 2: ......