
Service and maintenance
6.4 Conversion of MicroSAM basic device AS09
MicroSAM
Operating Instructions, 06/2012, C79000-G5376-C560-07
95
10.
Interchange the plugs to the solenoid valves MV3 and MV5.
Procedure: Preparation for use of analysis modules of type A
View of EPC module
①
Disconnect the solenoid valve MV5 (plug number 5).
①
Disconnect the solenoid valve MV3 (plug number 3).
③
Connect the cable number "3" to the solenoid valve MV5. The cable number "5" is not
required in the configuration of type A.
11.
Reinsert the RSP module.
12.
Close the housing.
The basic device AS09 is now prepared for use of analysis modules of type A.
Summary of Contents for MicroSAM
Page 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Page 2: ......
Page 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...