
Service and maintenance
6.1 Maintenance of analysis module
MicroSAM
86
Operating Instructions, 06/2012, C79000-G5376-C560-07
7.
Attach the insulating cover.
8.
Carefully screw in the cover as far as possible.
9.
Rotate the 2.0 mm hexagon socket-head bolt
②
in the cover
①
in the clockwise
direction until it is closed.
WARNING
Tightening the locking screw
According to the explosion protection regulations, all housing covers which have to be
unscrewed to open the housing must each be secured against unintentional opening by
a locking screw. This is achieved for this device using the hexagon socket-head bolt
②
.
Before opening, loosen this hexagon socket-head bolt
②
.
Following closing, tighten this hexagon socket-head bolt
②
.
10.
Restart the device. During the startup process, the analysis parameters are reestablished
by downloading the individual setups supplied with the analysis module.
Summary of Contents for MicroSAM
Page 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Page 2: ......
Page 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...