
Service and maintenance
6.1 Maintenance of analysis module
MicroSAM
Operating Instructions, 06/2012, C79000-G5376-C560-07
85
3.
Adjust the M14 nut flush as shown in the following photo at
①
.
4.
Screw the M14 nut by hand onto the guide pin. Make sure that the adjustment is retained.
CAUTION
Damage to the connection
When installing the analysis module, the packing glands of the module are sealed by the
pneumatic connector. Only use the supplied ring spanner. If you apply too much force
by using a different ring spanner with a longer lever arm, the connection will be
damaged.
5.
Tighten the M10 lock nut using the ring spanner A/F 10.
6.
Rotate the M14 nut clockwise using the A/F 21 ring spanner until the 2.0 mm thread
②
becomes visible.
Summary of Contents for MicroSAM
Page 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Page 2: ......
Page 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...