
Service and maintenance
6.3 Installing and removing electronic components
MicroSAM
92
Operating Instructions, 06/2012, C79000-G5376-C560-07
6.3.2
Installation of electronic modules
CAUTION
Note the correct mounting position
Make sure that the modules are correctly positioned when installing:
The EPC module has three plug connectors. The side on which the plug connector is
"missing" must point toward the cable gland of the chromatograph.
The RSP module has one cutout. This cutout must point toward the cable gland of the
chromatograph.
Installing the EPC and RSP modules
● Install the two modules in the reverse order to that when removing.
Installing a new CAC module
● Position the CAC module correctly above the connectors, and push in uniformly. Only
press on the two short sides (above the connectors).
Closing the housing
1.
Carefully screw in the cover as far as possible.
Summary of Contents for MicroSAM
Page 1: ...Process Gas Chromatography Process Gas Chromatograph MicroSAM Operating Instructions 03 2012 ...
Page 2: ......
Page 8: ...Table of contents MicroSAM 6 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 10: ...Purpose of this documentation MicroSAM 8 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 106: ...Examples MicroSAM 104 Operating Instructions 06 2012 C79000 G5376 C560 07 ...
Page 114: ...Dimension drawings MicroSAM 112 Operating Instructions 06 2012 C79000 G5376 C560 07 ...