230/245
Building Technologies Division
Basic Documentation LME7...
CC1P7105en
Infrastructure & Cities Sector
27 PWM settings
29.11.2011
Press
/reset
to go to the respective group
Press or
to select parameter
675.00
(
675
blinking)
Press
/reset
for >1 second. Subindex
00
blinks
Press
/reset
Press
or
to set the previously determined value
-1%
of parameter
920
(prepurge phase (P30))
Press
/reset
to transfer the setting value to the onboard memory
By
pressing
ESC
(press
and
simultaneously) you return to the
subindex. Display shows
00
blinking
Press or
to select subindex
01
Press
/reset
Press
or
to set the previously determined value
-1%
of parameter
920
(ignition phase (P38, 40 and 44))
Press
/reset
to transfer the setting value to the onboard memory
By
pressing
ESC
4 times (press
and
simultaneously) you leave the
parameter setting level and return to the initial mode
Note:
Test mode is indicated by the unit’s 7-segment display changing from
SEC
to the
relevant program phase at 1-second intervals.
Checking prepurging
To check the prepurge speed, set the required worst-case conditions close to the
undervoltage limit
Start the burner and check the speed, the volumetric air flow or air pressure by
taking appropriate measures while ensuring compliance with the relevant
standards (e.g. EN 676) in the prepurge phase (P30)
If the worst-case requirements are not satisfied, change safety parameter
675.00
accordingly
Checking the ignition load
To check the ignition load speed, set the required worst-case conditions close to
the
overvoltage limit
Start the burner and check the speed, the volumetric air flow or air pressure by
taking appropriate measures while ensuring compliance with the relevant
standards (e.g. EN 676) in the ignition phase (P38, P40 or P44)
If the worst-case requirements are not satisfied, change safety parameter
675.01
accordingly
On successful completion of the test, reset parameter
559
to control as described
above (setting value = 1).
Note:
To store the settings in the PME... program module, a manual backup is required.
Also see chapter
Manual backup
.