243/245
Building Technologies Division
Basic Documentation LME7...
CC1P7105en
Infrastructure & Cities Sector
29.11.2011
Figure 34: Connection diagram fuel train gas pilot ignition 1 (Gp1/1), 1-stage .............86
Figure 35: Connection diagram for LME72.000... with actuator SQM4... (example 1) ..87
Figure 36: Connection diagram for LME73.000... without actuator SQM4... .................88
Figure 37: LME72.000...: Inputs and outputs/internal connection diagram ...................90
Figure 38: Program sequence PME73.810... for connection diagram fuel train (G)......93
Figure 39: Connection diagram fuel train gas direct ignition (G), 1-stage .....................95
Figure 40: Connection diagram fuel train gas direct ignition (G), 2-stage .....................95
Figure 41: Connection diagram fuel train gas direct ignition (G), 1-stage, with valve
proving....................................................................................................................96
Figure 42: Connection diagram fuel train gas direct ignition (G), 2-stage, with valve
proving....................................................................................................................96
Fig. 43: Valve proving with separat pressure switch .....................................................97
Figure 44: Connection diagram for LME73.000... with actuator SQM4... (example 1) ..99
Figure 45: LME73.000...: Inputs and outputs/internal connection diagram .................101
Figure 46: Program sequence PME73.820... for connection diagram fuel train (G)....105
Figure 47: Connection diagram fuel train gas direct ignition (G), 1-stage ...................107
Figure 48: Connection diagram fuel train gas direct ignition 1 (G), 2-stage ................107
Figure 49: Connection diagram fuel train gas direct ignition 1 (G), 1-stage, with valve
proving..................................................................................................................108
Figure 50: Connection diagram fuel train gas direct ignition (G), 2-stage, with valve
proving..................................................................................................................108
Figure 51: Valve proving with separate pressure switch .............................................109
Figure 52: Connection diagram for LME73.000... with actuator SQM4... (example 1) 111
Figure 53: Connection diagram for LME73.000... without actuator SQM4... ...............112
Figure 54: LM73.000...: Inputs and outputs/internal connection diagram....................114
Figure 55: Program sequence PME73.830... for connection diagram fuel trains
(G)/(Gp1/1)/(Gp1/2)..............................................................................................118
Figure 56: Connection diagram fuel train gas direct ignition (G), 1-stage ...................120
Figure 57: Connection diagram fuel train gas pilot ignition 1 (Gp1/1), 1-stage ...........120
Figure 58: Connection diagram fuel train gas pilot ignition 1 (Gp1/2), 1-stage, with valve
proving..................................................................................................................121
Figure 59: Connection diagram fuel train gas direct ignition 1 (Gp1/2), 1-stage, with
valve proving ........................................................................................................121
Figure 60: Valve proving with separate pressure switch .............................................122
Figure 61: Connection diagram for LME73.000... with actuator SQM4... (example 1) 124
Figure 62: LM73.000...: Inputs and outputs/internal connection diagram....................126
Fig. 63: Program sequence PME73.831... to connection diagram fuel trains
(G)/(Gp1)/(Gp2)....................................................................................................130
Fig. 64: Program sequence PME73.831... to connection diagram fuel trains
(G)/(Gp1)/(Gp2)....................................................................................................131