99/166
Siemens
RXB (KNX) application library
FNC Description of functions for FC-10, FC-11, FC-12 CM110385en_05
Building Technologies
Control sequences
28 Feb 2009
If an electric reheater is used, the controller makes the present power demand
available on the bus.
In order for this to happen, the capacity of the heater battery must be written to the
controller via the tool.
Select
Sequences, Power consumption el heater
:
Select
Sequences, Power consumption
:
HandyTool
Parameter
Short name
Basic setting
*057
Power consumption el heater
0 W
Power demand
ETS3
Professional
ACS
Service