PLS
GB
8 009 810/OA87/13-09-04 Operating Instruction
•
PLS © SICK AG
•
Industrial Safety Systems
•
Germany
•
All rights reserved
149
4. Mounting
4.1 Mechanical mounting
The PLS can either be mounted directly using the appropriate ta-
pholes in the housing, or by using mounting kits. Please refer to the
dimensional drawings of the PLS and the mounting kits in the ap-
pendix, as well as additional notes regarding the choice of the cor-
rect mounting location in the technical description.
Note:
When installing on systems with severe vibrations you should
use thread-locking agents or mechanisms to prevent unintentional
loosening of setscrews and mounting screws, and regularly check
that these screws are secure.
4.2 Electrical installation
When connecting the PLS you can either terminate the power supply
plug yourself and decide whether you want the cable to come out of
the top or the bottom, or you can use ready-made cables in varying
lengths (cable exit only out of the top).
The communication connection to the PLS is made using a screened
data cable (see chapter Accessories in the technical description).
Please read the notes on the following page!
Summary of Contents for PLS 10X-317
Page 340: ......