64(65)
6.5 Maintenance Schedule
6.5.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.5.2 Check After Installation
Check if the lockup screws of the blades are locked firmly.
Check if the star knob is firmly tightened.
Check the rotating balance of the belt pulley.
Electrical Installation
Voltage: V Hz
Specs of the fuse: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
6.5.3 Daily Check
Check main power switch.
Check emergency stop button.
Check start / stop button.
Check material check plate (strip) is perfect or not.
Check whether emergency stop and safety switch works normally.
Clean screen and feeding hooper.
Check whether start, stop and power switches are normal.
6.5.4 Weekly Check
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check blade condition.
Check whether set screws in fixed and rotate blades are under looseness.
Check if there is abnormal noise, vibration and heat in reduction gear.
Check the cracking window
6.5.5 Monthly Check
Check the status of the belt.
Check the overload protection function of the motor.
Summary of Contents for SG-24T
Page 1: ...SG 24T Screenless Granulator Date Apr 2013 Version Ver B English...
Page 2: ......
Page 8: ...8 65...
Page 25: ...25 65 2 3 3 Cutting Chamber and Blade Rest Picture 2 5 Cutting Chamber and Blade Rest...
Page 29: ...29 65 2 4 Electrical Diagram 2 4 1 Main Circuit 400V Picture 2 9 Main Circuit 400V...
Page 30: ...30 65 2 4 2 Control Circuit 400V Picture 2 10 Control Circuit 400V...
Page 31: ...31 65 2 4 3 Electrical Components Layout 400V Picture 2 11 Electrical Components Layout 400V...
Page 34: ...34 65 2 4 5 Main Circuit 230V Picture 2 12 Main Circuit 230V...
Page 35: ...35 65 2 4 6 Control Circuit 230V Picture 2 13 Control Circuit 230V...
Page 36: ...36 65 2 4 7 Electrical Components Layout 230V Picture 2 14 Electrical Components Layout 230V...
Page 40: ...40 65 2 5 4 Proportional Valves Picture 2 18 Control Cabinet and Valve...