44(65)
3.2 Installation Place
Check and make sure the installation ground is level; there is enough intensity
when it is running. Lockup the castors.
Picture 3-2: Installation Place
3.3 Installation of Bearing and Blade Rest
1) Install the bearing 2. bearing washer 1. bearing sleeve 7 into the bearing
base 3.
2) Insert the blade shaft4into the bearing sleeve vertically 7.Then sleeve the
staggered blade 5 and the teeth blade 6 on the bearing spacing.
Picture 3-3: Installation of Bearing and Blade Rest 1
3) Put the blade rest 2 into the cutting chamber 1, let both terminals of the
bearing tallies with the grooves.
Summary of Contents for SG-24T
Page 1: ...SG 24T Screenless Granulator Date Apr 2013 Version Ver B English...
Page 2: ......
Page 8: ...8 65...
Page 25: ...25 65 2 3 3 Cutting Chamber and Blade Rest Picture 2 5 Cutting Chamber and Blade Rest...
Page 29: ...29 65 2 4 Electrical Diagram 2 4 1 Main Circuit 400V Picture 2 9 Main Circuit 400V...
Page 30: ...30 65 2 4 2 Control Circuit 400V Picture 2 10 Control Circuit 400V...
Page 31: ...31 65 2 4 3 Electrical Components Layout 400V Picture 2 11 Electrical Components Layout 400V...
Page 34: ...34 65 2 4 5 Main Circuit 230V Picture 2 12 Main Circuit 230V...
Page 35: ...35 65 2 4 6 Control Circuit 230V Picture 2 13 Control Circuit 230V...
Page 36: ...36 65 2 4 7 Electrical Components Layout 230V Picture 2 14 Electrical Components Layout 230V...
Page 40: ...40 65 2 5 4 Proportional Valves Picture 2 18 Control Cabinet and Valve...