11
Product Version 1.0 | Revision E | Released 2023-01-11
Figure 3: G-7 Spot Tilt Lock
Figure 4: G-7 Spot Pan Lock
RIGGING PROCESS USING SGM OMEGA BRACKET
Start the rigging process by blocking the lower working area, and make sure the work is performed from a stable
platform.
1. Select a clamp / bracket is undamaged and can bear at least 10 times the weight of the fixture. Check that
the structure can bear at least 10 times the weight of all installed fixtures, lamps, cables etc.
2. Bolt the clamp / bracket securely to the omega bracket with a M12 / ½" bolt (min. grade 8.8 C5M) and a lock
nut.
3. Align an Omega bracket with two 1/4-turns in the G-7 Spot base. Insert the fasteners into the G-7 Spot base
and turn both levers a full 1/4-turn clockwise to lock. Install the second Omega bracket.
4. Working from a stable platform, hang the fixture on a truss, or other structure. Note the position of the base.
Tighten the clamps.
5. Install a safety wire that can bear at least 10 times the weight of the fixture. The safety wire attachment point
is designed to fit a carabiner.
6. Check if the tilt lock is released. If not, push the slide button shown in the figure 3 to the right to release the
tilt lock.
Tilt lock - slide button
7. Check if the pan lock is released. If not, slide the
pan lock shown in the figure 4 to the right to
release the pan lock.
8. Verify that there are no combustible materials
or surfaces within 300 mm (12 in.) of the fixture.
9. Check that there is no possibility of head or
yoke colliding with other fixtures.