background image

Installing the Housing  

Hook the housing over the top of the mounting plate and fasten through predrilled holes 
in the back of the housing.

 

Model 600 component:  

housing (with curtain assembly removed) 

Tools/Materials:  

°

 

permanent marker 

°

 

safety eye wear   

°

 

drill 

°

 

#10 x ½ self tapping pan head screws with 5/16 hex head  

NOTE: Always keep your head higher than the housing while mounting. This makes the 
job easier and helps to avoid head injury. 

To mount the housing on the mounting plate: 

NOTE: The curtain sits in the housing during shipping. Prior to mounting the housing, 
use the door key to open the housing door and remove the curtain. 

1.  Hook the top of the housing return over the beveled edge of the mounting plate.  

NOTE: If the housing does not fit over the mounting plate, GENTLY pry along the 
length of the beveled edge on the plate just enough to fit the housing tightly over 
the plate. 

2.  Verify that the center mark on the housing meets the centerline of the elevator 

frame. 

3.  If the center lines do not meet, gently tap the sides of the housing to slide it along 

the mounting plate, being careful not to damage the housing.  

4.  Verify that the housing fits tightly on the mounting plate. 

 

 

 

11 

 

Summary of Contents for Namsen 600

Page 1: ...Installation Manual For Model 600 smoke containment systems from Smoke Guard Smoke Guard Technical Services 1 800 215 6138 ...

Page 2: ......

Page 3: ...Installation Manual For Model 600 smoke containment systems from Smoke Guard Smoke Guard Technical Services 1 800 215 6138 Doc 601 Rev 24 for use with housing Rev 3 ...

Page 4: ...2 ...

Page 5: ...he Curtain 17 Installing the Curtain Rewind Switch 21 Re attaching the Housing Door 22 Calibrating the System 23 Testing the Installation 24 Securing the curtain 25 Preparing the Unit for the Electrical Contractor and Alarm Technician 26 Appendix A Suggested Mounting Plate Anchors 27 Appendix B Wiring Diagram 28 Appendix C Troubleshooting a System Fault 29 3 ...

Page 6: ...hen the smoke detector to which the housing is wired goes into alarm For information about the Model 600 and building codes see the Model 600 Operation and Maintenance Manual About installation of the Model 600 Installers of the Model 600 require a moderate amount of construction experience Specifically installation requires tools and materials listed on page 5 and experience with the following dr...

Page 7: ...ipping 2 rail mounting channels 2 auxiliary rails rails required for most installations end of line diode in junction box on left side of housing Per project installation materials Installation Overview Wiring Guide spare end of line diode door key roll of Kapton tape housing curtain mounting J clips not included in shipment available from Smoke Guard bag of fasteners motor jogger not included in ...

Page 8: ...Tools and materials furnished by the installer In addition to the components and materials supplied by Smoke Guard installation requires the following tools and materials 6 ...

Page 9: ...he floor to the bottom of the housing at least 10 inches tall at least 12 inches deep at least 2 inches wider than the housing allowing the curtain to be centered over the door mounting height marked with a chalk line devoid of ceiling and grid in housing area with backing extending the full width and height of clearance behind new wall construction or over existing wall construction distance from...

Page 10: ...in the full width extending from the bottom of housing to the floor including elevator position indicators signs and hall call stations includes clearance for door swing with 2 inch wide backing for auxiliary rail backers extending the full height behind new wall construction or over existing wall construction Remove Housing Door Installation will be easier if you remove the housing door before yo...

Page 11: ...hich you fasten to the wall over the elevator frame through predrilled holes Model 600 component mounting plate Tools Materials 25 foot measuring tape safety eye wear hand drill permanent marker 3 ft magnetic level 8 10 wall fasteners drill bit and driver appropriate for the material see Appendix A for recommended fasteners predrilled holes on mounting plate 9 ...

Page 12: ... through studs it is not necessary to center the mounting plate precisely over the elevator frame as long as the housing itself is centered and covers the plate completely 7 Align the bottom of the mounting plate with the line you marked in step 3 8 Level the plate horizontally and flush against the wall 9 Mark and drill holes for fasteners 10 Drill at least 8 holes 4 through the top row of predri...

Page 13: ...in sits in the housing during shipping Prior to mounting the housing use the door key to open the housing door and remove the curtain 1 Hook the top of the housing return over the beveled edge of the mounting plate NOTE If the housing does not fit over the mounting plate GENTLY pry along the length of the beveled edge on the plate just enough to fit the housing tightly over the plate 2 Verify that...

Page 14: ...he housing into the mounting plate 2 Verify that the housing is level sturdy and flush with the wall 3 Drill and anchor through 3 or 4 more holes along the width of the mounting plate 4 Verify that each anchor is flush and tight against the housing to avoid damage to the curtain 12 ...

Page 15: ...evator frame is no more than 1 4 inch from the bottom of the housing Fasten rail mounting channels to the wall then fit rails over the channels and pop rivet on the return edges Mounting the rail mounting channels The rail mounting channels attach to the wall along the sides of the elevator frame leaving room for the rail to fit over the channel NOTE When measuring for the length of the rails take...

Page 16: ...enly spacing the holes approximately 16 inches apart TIP Drill holes within 1 inch of each end of the rail 4 Align the center of a mounting channel with the centerline for the right channel which is marked inside the housing the INSIDE line of the pair of vertical lines 5 Level the mounting channel vertically 6 Mark and drill holes into the wall lining them up with the holes that you drilled throu...

Page 17: ... but NOT tin snips NOTE When measuring for the length of the rails take into consideration the thickness of the flooring that will be added later If possible obtain a sample of the flooring to place on the floor when you perform the following steps Model 600 Components 2 auxiliary rails Tools Materials sample of flooring permanent marker hacksaw jigsaw or band saw 25 measuring tape safety eye wear...

Page 18: ...for the left rail 4 Drill several evenly spaced holes along each RETURN edge of each rail For a 9 foot rail drill 6 or 7 holes per side 5 Mount the rails over the mounting channels placing the FACTORY CUT edge against the housing 6 Slide each rail up its mounting channel until the rail is flush with the bottom of the housing and flush against the wall 7 Drill the channel through the holes drilled ...

Page 19: ...ded by Smoke Guard to certified installers to position the curtain NOTE If possible two people should set the curtain on the rails to reduce the chance of damaging the curtain Model 600 component curtain assembly Tools Materials 2 J clips jogger safety glasses hand drill 5 16 hex driver drill point screws provided 120 VAC extension cord with ground To attach J clips Position magnetic J clips again...

Page 20: ...l sideways until the curtain is taut The curtain should overlap the rails or side of the elevator frame in some installations by on each side Attach the threshold cables 1 Release the zip tie from the length of cable wound up on each side of the housing 2 Unwind enough cable to reach the threshold spools 3 Work the cable through the slots in the spools and pull the cable up lodging the crimp bead ...

Page 21: ...ct the other wiring harness from the jogger to the harness from the battery inside the housing 3 Press the UP button briefly to jog the curtain up to release the J clips 4 Run the curtain down to the floor 5 Verify that the magnets cover BOTH rails COMPLETELY and the threshold seals along its FULL LENGTH at the floor 6 If necessary run the curtain back up near the housing and pivot the top bar on ...

Page 22: ...hold seals along its FULL LENGTH at the floor 10 If necessary run the curtain back up near the housing and pivot the top bar on the center stud to re position the curtain until it seals properly 11 When the curtain is positioned properly fasten through each side of the top bar with a drill point screw 20 ...

Page 23: ...ton tape Tools Materials permanent marker measuring tape utility knife zip ties supplied NOTE Any alteration to a place of public accommodation or a commercial facility shall be made so as to ensure that to the maximum extent feasible the altered portions of the facility are readily accessible to and usable by individuals with disabilities including individuals who use a wheelchair Americans with ...

Page 24: ...nting bracket in the housing to stabilize extra wire keeping wire free of other housing components 8 Tape the wire to the curtain with the Kapton tape to stabilize the wire NOTE There is a delay of several seconds after deployment before the curtain rewind switch will operate This avoids accidental activation during deployment Re attaching the Housing Door When you have completed the curtain insta...

Page 25: ...use the rewind switch to run the curtain up and down 6 Use an extension cord with ground to connect the pigtail from the housing to the nearest source of grounded 120VAC 7 Switch the power ON and STAND BACK The curtain should roll up into the housing and stop To calibrate the system From the factory the unit is calibrated to a 10 foot mounting height You need to re calibrate it for the actual moun...

Page 26: ...eshold seals along its FULL length at the floor 3 After the curtain has been deployed a few seconds press the rewind switch on the curtain The curtain rewinds temporarily and redeploys 4 Use the inside of the rewind switch to rewind temporarily 5 Set the system back in a ready state by opening the alarm circuit Undo step 1 6 If the installation includes the optional wall switch deploy and rewind u...

Page 27: ...n each spool find the point where the magnet on the spool meets the magnet on the railing Mark each spool 1 2 below the meeting point as illustrated NOTE Depending on the distance from the housing to the floor you may have multiple wraps around the threshold spools 5 Roll the curtain up the railings or frame until you see the mark you made in step 3 6 At the mark anchor the magnet to the spool usi...

Page 28: ...de the housing Disconnect the battery Disconnect the diode and return it to the junction box Leave the Wiring Guide for the electrical contractor Setting the unit in a ready state When the electrical contractor has wired the diode at the smoke detector or other initiating device and wired the unit to building power Use the door key to pull the door open Turn the power ON inside the housing Connect...

Page 29: ... depth drilled 3 8 inch 1 5 8 inch 3 8 inch 2 inch 6 hollow gypsum wallboard Zip It diameter length screw drill bit minimum depth drilled standard 3 8 to 1 inch 1 16 inch by 1 inch 1 8 inch self drilling 6 metal backer or studs Twin Fast self drilling screw head type length driver 5 16 inch hex washer head wallboard plus 1 2 inch 6 inch x 5 16 inch hex driver 6 27 ...

Page 30: ...Appendix B Wiring Diagram 28 ...

Page 31: ...th deploy in accordance with FSCS request Normal 6 No AC battery active 1 blink on 5 S off 5 S off 1 blink on 5 S off 5 S N A Low voltage power supply or main power off running on battery Error 1 Battery health low off 1 Blink on 5 S off 5 S on Yes Battery or controller problem Error 2 Obstruction or out of calibration off 2 Blink on 5 S off 5 S on Yes If obstruction then fault deploy Error 3 LAS ...

Reviews: