To mount the auxiliary rails:
1. If using full auxiliary rails, measure along the right rail mounting channel to find
the distance between the floor and the bottom of the housing.
OR
If using stub rails between the bottom of the housing and the top of the elevator
frame head, measure the distance between the two.
2. Use the hacksaw, jigsaw, or band saw to cut the rail.
3. Repeat steps 1 and 2 for the left rail.
4. Drill several evenly spaced holes along each RETURN edge of each rail.
For a 9 foot rail, drill 6 or 7 holes per side.
5. Mount the rails over the mounting channels, placing the FACTORY CUT edge
against the housing.
6. Slide each rail up its mounting channel until the rail is flush with the bottom of the
housing and flush against the wall.
7. Drill the channel through the holes drilled in step 4.
8. Rivet the holes while holding the rail flush with the housing and the wall.
9. Verify that the rails are vertically level.
drill rivet holes 1/2 to 5/8
inch from the rail edge
16