40
│ 7 Device inspections
7.5
Due date
Device inspections are due when the specified intervals have
2
been exceeded.
In
Manual
operating mode, after a device has been detected,
the test set indicates that device inspections are due (fig. 28).
Fig. 28:
Manual
operating mode
– Mark due device inspections
with the
Device inspection due
symbol (
here:
Warning
applica-
tion due)
7.6
Presentation of results
The results of subtests and the overall results of a device inspec-
tion are displayed using the following symbols:
Device inspection passed
Acceptance of a passed subtest
Device inspection failed
Fig. 29: Device inspection – results
Left image: Overview of the applications tested
(
here:
Warning
application failed and the device
inspection as a whole failed)
Right image: Results of the subtests
(
here:
Structure
application, all subtests passed)
2
Setting using the
GasCom
software.