![Servomex SERVOTOUGH Oxy Operator'S Manual Download Page 58](http://html1.mh-extra.com/html/servomex/servotough-oxy/servotough-oxy_operators-manual_1247065058.webp)
46
© Servomex Group Limited. 2020
01910001B_8
Sample gas
measurement
Pre-warning period
Flushing phase
Flushing phase
Inerting phase
Flushing phase
Auto calibration (high)
Auto calibration (low)
Inerting phase
Sample gas
measurement
Time
Initiate auto calibration
Service in progress (SIP)
status on
Route calibration gas 1
into the analyser
Route calibration gas 2
into the analyser
Route calibration gas 1
into the analyser
Route sample gas into the
analyser
Service in progress (SIP)
status off
Figure
23 -
Typical automa�c calibra�on sequence
5.15.3
Remote calibration or automatic
validation/calibration
Switch inputs can be set to remote
calibra�on mode (Remote cal), automa�c valida�on/calibra�on mode
(Auto val) or disabled so the inputs will have no func�on.
In Remote cal
mode, switch input pins P108 1 and 2 ac�vate a transducer low calibra�on (as if the
request had been selected from the user interface) and switch input pins P108 3 and 4 ac�vate a
transducer high calibra�on. Switch input pins P108 5 and 6 ac�vate the transducer service in progress
(SIP) status, which must be closed before either calibra�on can be executed. Thi
s is to ensure a
calibra�on cannot be executed without a service in progress status being ac�vated. For example, to
carry out a remote low calibra�on:
Close pins 5
-6
Remote service in progress (SIP) on (latching switch)
Close pins 1
-2
Ac�vate low calibra�on (momentary switch)
Open pins 5
-6
Remote service in progress (SIP) off
A
calibra�on will be successfully completed
if the current measurement is equal to the target
measu/
-
the auto valida�on tolerance values, See Figure
. If this condi�on
is not met a
Maintenance required status will be raised.
Summary of Contents for SERVOTOUGH Oxy
Page 2: ...This page inten onally blank...
Page 4: ...This page inten onally blank...
Page 20: ...8 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 28: ...16 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 30: ...18 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 41: ...01910001B_8 Servomex Group Limited 2020 29 Figure 12 Fixing dimensions mm...
Page 82: ...70 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 98: ...86 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 110: ...98 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 112: ...100 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 126: ...114 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 130: ...118 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 132: ...120 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 140: ...128 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 142: ...130 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...
Page 144: ...132 Servomex Group Limited 2020 01910001B_8 This page inten onally blank...