-
23
-
Operation
■
Preparation
Operation
■
Preparation
(when stacker unit installed)
1.
Install the main tray on the main body unit. Hook the tabs on the end of the main
tray into the slots on the main device’s paper discharge side.
2.
Install the selection tray on the main body unit. Hook the tabs on the end of the
selection tray into the slots on the main device’s paper discharge side.
3.
Connect the power cord to the main device.
Main tray
Selection tray
*
When using the printer, operate P75 “ Stacker unit (printer) preparation ”
SR-3565(E).indd 23
SR-3565(E).indd 23
2007-8-16 10:18:51
2007-8-16 10:18:51
Summary of Contents for SR-3500
Page 123: ......